How do you open a trampoline park?

The order of the steps, from the first idea to opening day.

In short: First you research the area and look for premises. Then come the design, quotation, licences, manufacture, building work, installation and team training. Do not sign for any premises until a manufacturer has checked the height and the pillars.

What are the steps?

  • Research the area: audience, competition and access
  • Run the first numbers on investment and running costs
  • Find premises and have the manufacturer check them
  • Commission the 3D design and the quotation
  • Ask your local authority about licences
  • Finalise funding and insurance
  • Complete the building work
  • Manufacture and installation
  • Train the staff and set up bookings
  • Carry out the pre-opening inspection and open

Which mistakes cost the most?

Signing for premises without checking the clear height, leaving licences until the end, and budgeting only for the equipment, without building work, air conditioning or opening costs.

Start with the numbers

Work out your investment using your own figures.

Open the calculator